Thursday, May 26, 2016

The Cockpit Project Installing the Teak Decking

The synthetic teak was waiting for us when we arrived back home. The package included 8 tubes of M1 polyether adhesive, a serrated trowel and 13 precut pieces of the teak material. They had sent me a first article back in August that didnt come close to fitting properly, but we worked out the problems and they remade that part and shipped it along with the rest of the pieces. The first thing I did was check fit each one on the deck, and they all fit reasonably well. 


Once I was sure all the pieces fit, I taped off each recess, applied the adhesive and installed each piece one at a time. The finished cockpit looks a lot better than the weathered teak look that we had before. The total cost for the teak, adhesive and trowel was $1,009.00. I added two rolls of tape, some sandpaper, a carpet roller and a little acetone so the total material cost added up to about $1,040.00. It took about 20 hours spread out over a week to install all the pieces. 

I started with 3M #2050 masking tape which worked well. When I ran out of it I tried  #2090 blue tape. The lower tack allowed the M1 adhesive to penetrate between the tape and the teak which I had to sand off after it was cured. 
I applied the adhesive with a caulking gun then spread it with the trowel.

The adhesive was evenly spread across the seat, with a thick bead of it around the perimeter.
I used the carpet seam roller to press the teak into the adhesive. To get it to lay perfectly into the recess, I started rolling in the center and worked toward the edges, squeezing out any excess adhesive.

I pulled the tapes as soon as possible. The temperatures hovered near 100 degrees every day while I was doing the installation, so the adhesive started curing almost instantly. 

The finished installation looks good. The black "caulking lines" are aligned within about 1/8" from piece to piece.

Of course the project wouldnt be complete without new cockpit cushions. 
Were pretty happy with the final results and now that Plasteak has accurate digital files for the teak inserts, it should be easy for any Beneteau 423 to be fitted with synthetic teak. Feel free to call on me if you have any questions about the material or the process.

Monday, May 16, 2016

The Cockpit Table

When we bought Finisterra it was equipped with the standard steel and fiberglass cockpit table. It was great for dining but inconvenient for sailing the boat and for general living aboard. Last year I removed it and replaced it with a small pedestal that was really nothing more than a combination drinkholder/handhold/GPS mount, and it works great for all those purposes, but we still need a table of some sort in the cockpit. On our last voyage to Mexico we used a couple of plastic folding tables which worked okay for that trip, but I had always intended to build a fold-down table. Now that were home for awhile I got busy and built one out of teak.

Here is a typical table installation with the removable drop-leaves in place
Finisterra with the table removed. I used the existing mounting holes to install a teak footrest.
The pedestal is handy when were underway. The GPS is mounted on a swivel so it can be seen from anywhere in the cockpit. 


The new table measures 15.50" x 24.00"
I found a nice piece of teak at my local hardwood supplier. It was about 9 inches wide so I cut it to about 25 inches long and edge-bonded two pieces together to make a single piece. Then it was a simple matter to round off the edges and attach a folding leg to it.


In this photo you can just see the bolt that I used for a pivot. The table is attached to the underside of the wood part of the pedestal with a pair of stainless steel hinges.

I drilled a hole in the bottom of the leg and epoxied a stainless steel pin into it. It sticks out of the bottom about half an inch and fits into a  hole in the footrest. 
Table in the folded position.
When underway, the table is folded down and secured to the pedestal base, leaving the cockpit wide open. It took about 12 hours to make and install the table, not including the varnish work. 



Saturday, April 16, 2016

Installing a Chain Stopper



A while back I installed a Lewmar chain stopper on the foredeck to make anchoring a bit easier. It was a simple job to fashion a mounting block out of teak, make a backing plate out of apitong and bolt it all together. The job was done in a day. Then I went out and anchored and discovered that if I left it as is, the stopper would soon knock all the galvanizing off the chain. This is a standard flapper type chain stopper, rated at 5,000 lb SWL and sized for 5/16 chain. I had used this unit on my last boat, which had 1/4" chain and a vertical capstan windlass, and it worked well. The problem is that there is barely enough clearance in the stopper for the chain to pass through, and only if it is perfectly aligned and set at an angle that matches the angle of the chain as it passes from the windlass to the roller. On top of that, the deck in that area is only about half an inch thick. It is made of a fairly heavy fiberglass laminate and a bit of wood core.  This isnt really enough structure to simply throughbolt the stopper to, so I added a carbon fiber top plate and a larger wood backing plate to bring it up to snuff. The photos below outline the process.


Mold. 

First I measured the amount of crown in the deck forward of the anchor locker. Its nearly flat but I wanted the edges of the top plate to fit tightly to the deck so I created a bit of extra curvature in the mold, which is made of a piece of old 1/4" Starboard.

Paper pattern with pre-cut carbon fiber

I took a template off the deck and drew the shape in AutoCad. I wanted the top plate to be fairly large so I could attach it to the deck with several widely spaced fasteners to spread the loads out as much as possible. The rectangular shape is the outline of the teak mounting block.

Laminating the carbon fiber
I used four layers of Vectorply C-LT2200 carbon fiber cloth for the laminate. This fabric is made of carbon fiber bundles aligned along the 0 degree and 90 degree axes of the roll and stitched together. This architecture is stronger than traditional woven fabric. The four layers amounted to about 88 ounces/sq yd of material for a total thickness of about 3/16" when it was finished.

Second layer is rotated 45 degrees 

I oriented the first and fourth layers so the fibers run at 0 and 90 degrees to the centerline of the boat and rotated the second and third 45 degrees to provide strength in all directions. I used WEST systems resin which works really well for hand laminating projects.

Finishing the top plate

After the plate was laminated and cured, I glued another copy of the paper pattern to it so I could precisely locate all the holes. It was a simple matter to drill and countersink them exactly where they need to be.

Top plate ready for finish sanding and paint




Check fitting the hardware

Finished part installed

I made a backing plate out of 1" thick apitong that extends out to the bulwarks to help spread the loads as much as possible. The 10" cleat allows for a snubber to be run out over the port bow roller. I found that if I take a turn around the roller with the snubber, it wont jump off if it when the boat swings at anchor.

Chain and snubber geometry works
It took a couple of tries to get the alignment and angle of the stopper to match up perfectly with the chain. It would have been nice to have a larger stopper, but there was just enough clearance between the shank of the anchor and the hatch for this smaller unit.

55 LB Rocna just fits




Thursday, March 17, 2016

Americas Cup Lessons Learned

Apologies for the long hiatus from this blog. Its been a very busy six weeks since my last post, with several projects completed on Finisterra. But first we need to consider the AC regatta and lessons we can take from the racing and the boats themselves, and what this incredible event might mean for the future of the competition.

The boats:

1. It appears that Team Oracle really did have the better boat. I had thought that the bows might be too fine, lacking sufficient buoyancy to support the wing mast. But the designers and crew were able to keep the boat on its feet throughout the event. The Kiwis chose another route with fuller, more buoyant bows. Perhaps in a bit more swell that would have paid off, but it is clear that the Yanks had the faster boat for the conditions they encountered. This is an indication that Team Oracles designers had a better feel for the expected conditions on the bay and did a better job of targeting their boat for them, while the Kiwis opted for perhaps more of a safety margin in their bows and paid the price with more weight and windage up forward. This would cost them speed especially on the upwind legs.

2. Deck layouts for both boats showed significant differences. The most striking of which were the airfoils mounted on the aft cross beam of ENZ. There was a price to pay for them in terms of weight and drag and I think its doubtful that they did enough to smooth out the wind vortices swirling off the boat to offset the negative factors. The Kiwis seemed to have a more efficient winch layout, but I noticed in the later races there were times when grinders werent in the cockpit but grinding from a position on the trampoline instead. This was an indication to me that the crew was getting a bit rattled as they racked up loss after loss.

3. Much has been said about the fact that the tactician aboard Oracle had to grind winches on each tack or jibe while his counterpart on ENZ was able to keep his head out of the boat more and focus exclusively on tactics and strategy. This was more than offset by the addition of a strategist aboard Oracle. The early races showed that communication between tactician, strategist and helmsman would be crucial and it looked like ENZ had the better operational arrangement. However, once Ben Ainsley replaced John Kostecki those lines of communication improved drastically and it was beautiful to see how well Oracles afterguard worked together, and this was a key factor in Oracles string of victories.

4. There were other design features in the boats that probably made a difference. For example the helms on Oracle were angled inward a few degrees. This probably resulted in better ergonomics for the helmsman than the directly forward facing helms aboard ENZ.

5. As far as I could tell, the daggerboards were roughly the same but of course I dont know what the actual foil sections were. Another area of vital importance is the board control systems. We dont really know what the differences were and which worked best at raising and lowering them. Nor do we know which system worked best for adjusting cant and rake of the boards. Of course we can infer that Oracles worked better since they won but it would be fascinating to see side-by-side comparisons of these systems.

Ill write more about the actual racing in a later post.

Wednesday, March 16, 2016

Americas Cup The Plot Thickens

Just when we thought the Kiwis owned this regatta, the Yanks stepped up. As I mentioned previously, team Oracle is still on the steep part of the learning curve. They apparently took a giant stride forward over the last few days and the race results show it. Of course they still have a very steep hill to climb if they want to keep the Cup, but they are definitely improving their boatspeed, tactics and boat handling.

In race 8 team Oracle showed improved upwind boatspeed, but more important than that, they tacked much more efficiently than before. In previous races Oracle lost out to the Kiwis on nearly every tack but this time they held onto them on leg three. Near the top of that leg ETNZ, on port tack could not cross the starboard tack Oracle and attempted to tack under them, nearly capsizing in  the process. This rare boathandling mistake cost them the race and came near taking them out of the regatta altogether. No one knows if they would have won this race if not for the blown tack but the key point of this race is that Oracle managed to up their game and breathe some life into their chances.

With the next race canceled due to high winds, both teams retired to their respective corners, one to review what went wrong, the other to continue their climb up the learning curve. When race 9 got underway the next day, the Yanks showed that 8 was not a fluke. They won the start and led ETNZ at every mark.

Race 10 was a spectacular display of yacht racing. The American boat won the start but couldnt quite slam the door on the Kiwis at mark one and trailed on the run. It was on the next beat that we were treated to a tacking duel that no one prior to the event would have predicted. It was an awesome spectacle of high speed sailing, split second timing and superb boathandling. Rounding opposite marks at the windward gate the two boats split to opposite sides of the course and jibed back toward each other with ETNZ on starboard. This was a situation that has never happened before, two boats hurtling down the course at 40 knots, approaching each other on a collision course. Oracle opted to slow down and take the stern of the Kiwi boat. At this speed, the result was a 200 meter advantage for ETNZ and that was all they needed to take the race. Was the slowdown the right choice? I think that, given the situation, it was probably a better option than gybing on top of the Kiwis and getting pinned outside at the leeward mark. The question is how far ahead does the tactician have to think in order to make this the right decision. At 40 knots, the Kiwis were a long way off thirty seconds before the cross, but thats about when the decision to take their stern needed to be executed. This is sailing on a whole new level, the ultimate high speed chess game where the stakes include putting the lives of the crew on the line. Intense!




 

Boat Plans Download Copyright © 2016 -- Powered by Blogger